The size and shape of the attic More floor area and awkward corners mean more material and labour. +
Ask for the measured attic area on the quote. A simple rectangular attic is quicker to cover than a roof space split into several sections or filled with hard-to-reach corners.
Access and headroom A small hatch, low roof or difficult working space can increase labour. +
If access is tight, the installer may need more preparation time or a hatch improvement before work starts. Ask whether access work is included or will be charged separately.
What is already in the attic A clean top-up costs less than removing old or damaged material. +
Existing insulation does not always need to come out. Ask whether it can stay, be corrected or be topped up. If removal is recommended, get the reason, disposal method and price in writing.
The insulation material and depth Mineral wool is usually cheaper than rafter-level boards or spray foam. +
The quote should name the material, planned depth and area covered. Compare the same specification across quotes rather than choosing from the final total alone.
Boarding, storage and walkways Moving or raising boards can add hundreds of euro. +
Stored belongings and existing floorboards may need to be cleared, lifted or raised so the insulation is not compressed. Confirm who moves everything and whether reinstatement is included.
Tanks, pipes, downlights and wiring Obstructions need careful work and may add small extras. +
Ask how the installer will handle tank jackets, pipe lagging, downlight covers, wiring and chimneys. These items are often included in a good scope but should not be assumed.
Ventilation or signs of moisture Blocked eaves or condensation can turn a simple job into remedial work. +
Adding insulation without protecting airflow can create problems. Ask whether eaves ventilation has been checked and whether any leak, damp or condensation work needs to happen first.
Removal, disposal and paperwork Waste, BER (Building Energy Rating) work and grant documents may be separate line items. +
Check whether the price includes bags, disposal, cleaning up, VAT and any paperwork needed for a grant. If anything is excluded, ask for the likely extra cost before agreeing to the work.